1021. The construction works costing below five hundred dollars are classified as:
A. Minor works *
B. Major works
C. Projects
D. None of the above
1022. The construction works costing above two thousand dollars are classified as :
A. Minor works
B. Major works
C. Projects *
D. None of the above
1023. When the construction cost of a work is between 200 Dollars to 500 dollars then it is said to be a major work.
A. Agree
B. Disagree *
1024. The construction of residential buildings are treated as :
A. Light construction *
B. Heavy construction
C. Industrial construction
D. None of the above
1025. The construction of ____________ belongs to industrial construction :
A. Transit sheds
B. Tunnels
C. Dams
D. Power stations *
1026. The construction of airports are treated as :
A. Light construction
B. Heavy construction
C. Industrial construction
D. None of the above
1027. The first stage of a large construction work as :
A. Contract
B. Design
C. Conception *
D. Study and evaluation
1028. The pre tender stage of construction requires :
A. Selection of site
B. Acquisition of land
C. Finalisation of designs
D. Preparation of estimate
E. All of the above *
1029. Light construction includes works involving light structural members on massive foundation :
A. True
B. False *
1030. The post-tender stage of construction consists of :
A. Assessment of work
B. Assessment of expenditure during execution
C. Finalisation of accounts
D. All of the above *