471. Which of the following is a part of system release
A. electronic and paper documentation describing the system
B. packaging and associated publicity that have been designed for that release
C. an installation program that is used to help install the system on target hardware
D. all of the mentioned

Explanation: Release creation is the process of creating the collection of files and documentation that includes all of the components of the system release.

472. Which of the following is a collection of component versions that make up a system ?
A. Version
B. Code line
C. Baseline
D. None of the mentioned

473. A sequence of baselines representing different versions of a system is known as ____________________?
A. System building
B. Mainline
C. Software Configuration Item(SCI)
D. None of the mentioned

474. Which of the following is a configuration item ?
A. Design & Test specification
B. Source code
C. Log information
D. All of the mentioned

Explanation: A configuration item is an approved and accepted deliverable, changes have to be made through formal procedure.

475. Which of the following is not a build system feature ?
A. Minimal recompilation
B. Documentation generation
C. Storage management
D. Reporting

Explanation: To reduce the storage space required by multiple versions of components that differ only slightly, version management systems usually provide storage management facilities.

476. Which of the following is not a Version management feature ?
A. Version and release identification
B. Build script generation
C. Project support
D. Change history recording

Explanation: All other options are a part of version management

477. Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?
A. Agile method
B. Parallel compilation method
C. Large systems method
D. All of the mentioned

Explanation: In keeping with the agile methods notion of making many small changes, continuous integration involves rebuilding the mainline frequently, after small source code changes have been made.

478. Which of the following process is concerned with analyzing the costs and benefits of proposed changes ?
A. Change management
B. Version management
C. System building
D. Release management

Explanation: It involves approving those changes that are worthwhile, and tracking which components in the system have been changed.

479. What involves preparing software for external release and keeping track of the system versions that have been released for customer use ?
A. System building
B. Release management
C. Change management
D. Version management

480. Which of the following process ensures that versions of systems and components are recorded and maintained?
A. Code line
B. Configuration control
C. Version
D. Workspace

Explanation: In configuration control changes are managed and all versions of components are identified and stored for the lifetime.

NOTE
IF YOU THINK ANY OF THE MCQ ABOVE IS WRONG.
PLEASE COMMENT WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION IN COMMENT BOX.
THANK YOU