MCQs is one of the best ways to test a student’s comprehension of a concept. Academic Task subject experts have prepared these Software Engineering MCQs based on current trends and practices. These Software Engineering MCQs with answers cover all areas of Software Engineering. Furthermore, it will be beneficial for competitive examinations and tests (PPSC Test, FPSC Test, SPSC Test, KPPSC Test, BPSC Test, Test) as well. Software Engineering Questions and Answers cover the topic like Evolutionary Software Process Models, Selection of a Life Cycle Model, Fourth Generation Techniques, Software Process and Product – 1, Software Process and Product – 2, Agile Software Development, Extreme Programming, Requirement Engineering, Functional and Non-Functional Requirements, Requirement Elicitation, Requirement Elicitation Techniques – 1, Requirement Elicitation Techniques – 2, Requirement Analysis, Requirement Documentation, Requirement Management, etc. Also, check Civil Engineering Questions and Answers here.

131. Which of the following is a requirement management activity ?

A. Investigation
B. Design
C. Construction and Test
D. All of the mentioned

132. Requirements Management has a high initial start-up cost but does not need ongoing funding throughout a project ?

A. True
B. False

133. What functionality of Requirement Management Tool (RMT) is depicted by the statement: “the tool should be able to automatically detect relations between artifacts. For example information retrieval techniques, monitoring of change history, naming schemas or model transformations________________________?

A. Automatic Link Detection
B. Documentation Support
C. Graphical Representation
D. Automatic Link Creation and Change

134. Which of the following is not a Requirement Management workbench tool ?

A. RTM
B. DOORS
C. Rational Suite
D. RDD 100

135. Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management?

A. True
B. False

136. Narrative essay is one of the best types of specification document ?

A. True
B. False

137. What is the major drawback of CORE?

A. Requirements are comprehensive
B. NFRs are not given enough importance
C. Role of the analyst is passive
D. All of the mentioned

138. How is CORE different from IBIS?

A. Iterative in nature
B. Redundancies are removed
C. It is a simple and easier method to use
D. Consistency problems are addressed in CORE

139. How many steps are involved in Feature-Oriented Domain Analysis (FODA) ?

A. Two
B. Three
C. Four
D. Five

140. According to a statistical report: “over 30% of all software projects are cancelled before completion and over 70% of the remainder fail to deliver expected features”. What must be the reason for such a situation?

A. Poor change management
B. Poor requirements management
C. Poor quality control
D. All of the mentioned