381. The Capability Maturity Model (CMM) is a continuous model ?
A. True
B. False

Explanation:
The CMM is discrete rather than continuous.

382. Which of the following is not included in failure costs ?
A. rework
B. repair
C. failure mode analysis
D. none of the mentioned

Explanation:
Failure costs are those that would disappear if no defects appeared before shipping a product to customers.

383. Degree to which design specifications are followed in manufacturing the product is called_________________?
A. Quality Control
B. Quality of conformance
C. Quality Assurance
D. None of the mentioned

384. Which requirements are the foundation from which quality is measured ?
A. Hardware
B. Software
C. Programmers
D. None of the mentioned

Explanation:
Lack of conformance to requirements is lack of quality.

385. Which of the following is not included in External failure costs ?
A. testing
B. help line support
C. warranty work
D. complaint resolution

Explanation:
External failure costs are associated with defects found after the product has been shipped to the customer.

386. Who identifies, documents, and verifies that corrections have been made to the software ?
A. Project manager
B. Project team
C. SQA group
D. All of the mentioned

387. CMM stands for_____________________?
A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model

Explanation:
The Capability Maturity Model for Software describes the principles and practices underlying software process maturity and is intended to help software organizations improve the maturity of their software processes in terms of an evolutionary path from ad hoc, chaotic processes to mature, disciplined software processes

388. ISO 9001 is not concerned with _______________ of quality records?
A. collection
B. maintenance
C. verification
D. dis-positioning

Explanation:
The practices defining the quality records to be maintained in the CMM are distributed throughout the key process areas in the various Activities Performed practices

389. The CMM emphasizes____________________?
A. continuous process improvement
B. the need to record information
C. the need to accept quality system
D. none of the mentioned

Explanation:
CMM emphasizes the need to record information for later use in the process and for improvement of the process.

390. In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management

Explanation:
In CMM planning these activities is described in Software Project Planning, however the life cycle activities of requirements analysis, design, code, and test are described in Software Product Engineering.