381. The Capability Maturity Model (CMM) is a continuous model ?
A. True
B. False
Explanation:
The CMM is discrete rather than continuous.
382. Which of the following is not included in failure costs ?
A. rework
B. repair
C. failure mode analysis
D. none of the mentioned
Explanation:
Failure costs are those that would disappear if no defects appeared before shipping a product to customers.
383. Degree to which design specifications are followed in manufacturing the product is called_________________?
A. Quality Control
B. Quality of conformance
C. Quality Assurance
D. None of the mentioned
384. Which requirements are the foundation from which quality is measured ?
A. Hardware
B. Software
C. Programmers
D. None of the mentioned
Explanation:
Lack of conformance to requirements is lack of quality.
385. Which of the following is not included in External failure costs ?
A. testing
B. help line support
C. warranty work
D. complaint resolution
Explanation:
External failure costs are associated with defects found after the product has been shipped to the customer.
386. Who identifies, documents, and verifies that corrections have been made to the software ?
A. Project manager
B. Project team
C. SQA group
D. All of the mentioned
387. CMM stands for_____________________?
A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model
Explanation:
The Capability Maturity Model for Software describes the principles and practices underlying software process maturity and is intended to help software organizations improve the maturity of their software processes in terms of an evolutionary path from ad hoc, chaotic processes to mature, disciplined software processes
388. ISO 9001 is not concerned with _______________ of quality records?
A. collection
B. maintenance
C. verification
D. dis-positioning
Explanation:
The practices defining the quality records to be maintained in the CMM are distributed throughout the key process areas in the various Activities Performed practices
389. The CMM emphasizes____________________?
A. continuous process improvement
B. the need to record information
C. the need to accept quality system
D. none of the mentioned
Explanation:
CMM emphasizes the need to record information for later use in the process and for improvement of the process.
390. In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management
Explanation:
In CMM planning these activities is described in Software Project Planning, however the life cycle activities of requirements analysis, design, code, and test are described in Software Product Engineering.
NOTE
IF YOU THINK ANY OF THE MCQ ABOVE IS WRONG.
PLEASE COMMENT WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION IN COMMENT BOX.
THANK YOU