541. Waterfall model is not suitable for:
A. Small projects
B. Complex projects
C. Accommodating changes
D. Maintenance Projects
542. In the maintenance phase the product must be tested against previous test cases. This is known as __________ testing.
A. Unit
B. Regression
C. Acceptance
D. Integration
543. Which type of integration testing uses stubs?
A. Top down testing
B. Bottom up testing
C. Both in top down and bottom up testing
D. System testing
544. The process to gather the software requirements from client, analyze and document them is known as ___________________.
A. Feasibility Study
B. Requirement Gathering
C. Requirement Engineering
D. System Requirements Specification
545. The goal of requirement engineering is to develop and maintain sophisticated and descriptive _________________ document.
A. Feasibility Study
B. Requirement Gathering
C. Software Requirement Validation
D. System Requirements Specification
546. It is the process in which developers discuss with the client and end users and know their expectations from the software.
A. Requirements gathering
B. Organizing Requirements
C. Negotiation & discussion
D. Documentation
547. Which of the following is correct software metrics?
A. Complexity Metrics
B. Quality Metrics
C. Process Metrics
D. All of the above
548. Size Metrics denoted by?
A. LOC
B. KLOC
C. GLOC
D. ZLOC
549. What are the types of requirement in Quality Function Deployment(QFD) ?
A. Known, Unknown, Undreamed
B. User, Developer
C. Functional, Non-Functional
D. Normal, Expected, Exciting
550. How many steps are involved in Feature Oriented Domain Analysis (FODA) ?
A. 2
B. 3
C. 4
D. 5
NOTE
IF YOU THINK ANY OF THE MCQ ABOVE IS WRONG.
PLEASE COMMENT WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION IN COMMENT BOX.
THANK YOU