MCQs is one of the best ways to test a student’s comprehension of a concept. Academic Task subject experts have prepared these Software Engineering MCQs based on current trends and practices. These Software Engineering MCQs with answers cover all areas of Software Engineering. Furthermore, it will be beneficial for competitive examinations and tests (PPSC Test, FPSC Test, SPSC Test, KPPSC Test, BPSC Test, Test) as well. Software Engineering Questions and Answers cover the topic like Evolutionary Software Process Models, Selection of a Life Cycle Model, Fourth Generation Techniques, Software Process and Product – 1, Software Process and Product – 2, Agile Software Development, Extreme Programming, Requirement Engineering, Functional and Non-Functional Requirements, Requirement Elicitation, Requirement Elicitation Techniques – 1, Requirement Elicitation Techniques – 2, Requirement Analysis, Requirement Documentation, Requirement Management, etc. Also, check Civil Engineering Questions and Answers here.

11.Which one of the following models is not suitable for accommodating any change ?

A. Build & Fix Model
B. Prototyping Model
C. RAD Model
D. Waterfall Model

12. Build & Fix Model is suitable for programming exercises of ______________ LOC (Line of Code)?

A. 100-200
B. 200-400
C. 400-1000
D. above 1000

13. Which model can be selected if user is involved in all the phases of SDLC ?

A. Waterfall Model
B. Prototyping Model
C. RAD Model
D. both Prototyping Model & RAD Model

14. What is the major drawback of using RAD Model ?

A. Highly specialized & skilled developers/designers are required
B. Increases reusability of components
C. Encourages customer/client feedback
D. Increases reusability of components, Highly specialized & skilled developers/designers are required

15. Which one of the following is not a phase of Prototyping Model ?

A. Quick Design
B. Coding
C. Prototype Refinement
D. Engineer Product

16. As per an IBM report, “31%of the project get canceled before they are completed, 53% overrun their cost estimates by an average of 189% and for every 100 projects, there are 94 restarts”. What is the reason for these statistics ?

A. Lack of adequate training in software engineering
B. Lack of software ethics and understanding
C. Management issues in the company
D. All of the mentioned

17. The reason for software bugs and failures is due to _____________________?

A. Software companies
B. Software Developers
C. Both Software companies and Developers
D. All of the mentioned

18. Which of these does not account for software failure ?

A. Increasing Demand
B. Low expectation
C. Increasing Supply
D. Less reliable and expensive

19. Which of these software engineering activities are not a part of software processes ?

A. Software dependence
B. Software development
C. Software validation
D. Software specification

20. Which of these does not affect different types of software as a whole ?

A. Heterogeneity
B. Flexibility
C. Business and social change
D. Security

NOTE
IF YOU THINK ANY OF THE MCQ ABOVE IS WRONG.
PLEASE COMMENT WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION IN COMMENT BOX.
THANK YOU