1831. ________ is concerned with deciding in advance what is to be produced, when to be produced, where to be produced and how to be produced_____.
A. Operational planning *
B. Operational control
C. A and B
D. None of these
1832. The differences between the actual demand forecast fo that period is called _________.
A. Forecast error *
B. Weighted arthmetic mean
C. Decision process
D. Mean square error
1833. All of the following decision fall within the scope of operations managment except for ______.
A. Financial analysis *
B. Design of products and processes
C. Location of facilities
D. Quality managment
1834. ______ can be defined as the measurements that detect the onset of a degradation mechanism, thereby allowing casual stressors to be eliminated or controlled prior to any significant deterioration in the component physical state_______.
A. Break down maintenance
B. Predictive maintenance *
C. Past maintenance
D. None of these
1835. In the case of _______ type of maintenance, no actions or efforts are taken to maintain the equipment as the designer originally intended to ensure design life is reached ________.
A. Break down maintenance *
B. Preventive maintenance
C. A and B
D. None of these
1836. ________ is defined as the combination of tasks that are required to keep a machine or part of a machine in the desirable condition_______.
A. Substitution
B. Maintenance *
C. Reduction
D. Induction
1837. ___________ invovles systematically recording, analyzing and synthesizing the times required to perform as a motion_______.
A. Method study
B. Motion study
C. Time study *
D. All of these
1838. ________ refers to the manufacturing of large volume of a single or a very few varities of products with a standard set of processes _______.
A. Continuous production *
B. Intermittent production
C. Project production
D. None of these
1839. __________ is the process of predicting and defining the long term and the short-term capacity needs of an organization and determining how those needs will be satisfied _______.
A. Capacity Planning *
B. Capacity control
C. Staff fixation
D. Instrumentalisation
1840. _________ is a measure the actual level of output for a process or activity over a period of time __________.
A. Actual capacity *
B. Design capacity
C. Maximum capacity
D. None of these